ECdrive

ECdrive T2 * Automatic linear sliding door system for doors up to 140 kg leaf weight

ECdrive T2 / ECdrive T2-FR
  • Slim design with a cover height of just 100 mm for greater creative freedom
  • With double roller carriage and GCprofile Therm up to 140 kg leaf weight
  • Efficient installation thanks to pre-drilled tracks and elongated holes
  • Full floor guide available for controlled diversion of rainwater
  • Integrated cable routings make cable laying easier
  • Can be networked, and integrated into the building automation via open standard (BACnet)
  • Independent error recognition and recording
  • Freely configurable inputs and outputs for different functions
  • Integrated battery for emergency opening and closing in the event of a power failure
  • Self-cleaning roller carriage reduces maintenance effort and costs
  • Various mechanical and electrical locks are optionally available
  • Service interface for easy maintenance
Contact us

With its streamlined design, the ECdrive T2 guarantees new design possibilities and an outstanding price-performance ratio. Energy efficiency is additionally improved in conjunction with the GCprofile Therm profile system.

Application Areas

  • Single and double leaf sliding door systems
  • Interior and exterior doors with high access frequency
  • Complete solution for entrance areas with GCprofile Therm and fanlight
  • If extra impermeability or energy efficiency are needed
  • Opening widths from 700 to 3000 mm possible
  • Door leaf weight of up to 140 kg per leaf
  • Suitable profile systems are fine-framed profile systems with insulating and MONO glass, GCprofile Therm, toughened safety glass clamping profile, on-site frame and wooden leaves

Technical data

ECdrive T2
For 1-leaf door systems Yes
For 2-leaf door systems Yes
Fine-framed insulating glass Yes
MONO glass fine-framed Yes
ESG clamping profile Yes
Framed leaf (on site) Yes
Wooden leaf (on site) Yes
Height 100 mm
Depth 190 mm
Leaf weight (max.) 1-leaf 140 kg
Leaf weight (max.) 2-leaf 140 kg
Opening width 1-leaf 700 mm - 3000 mm
Opening width 1-leaf with GCprofile Therm 1500 mm
Opening width 2-leaf 900 mm - 3000 mm
Opening width 2-leaf with GCprofile Therm 3000 mm
Service temperature -15 - 50 °C
IP rating IP20
Disconnection from mains Main switch in the drive
Standard conformity DIN 18650. DIN EN ISO 13849: Performance Level D. EN 16005

Downloads

Product shot

Installation situation

Product data sheet

User manual

Installation instructions

Wiring diagram

Certificate

Supplementary sheet

Declaration of conformity

Inspection certificate

Safety analysis

Tender texts

Product brochure

Environmental declaration

Installation drawing

Errors/Measures

Variants & Accessories

Contact

GEZE Central +971-4-454-1434 Hotline for architects +971-4-454-1434 GEZE Service +971-4-806-3000