Opening drives

E 212 24 V * Electric linear drive for automation of fanlight openers

Linear drive E 212 R E 212 R
  • Cost-effective and simple motorised solution for activating several scissors
  • Can be integrated perfectly into the façade design thanks to its slim and discreet look
  • Opening width variably adjustable over stroke length and can be adjusted as necessary
  • Load cut-off and integrated limit switch as well as stroke are adjustable
  • Completely pre-mounted assembly groups facilitate installation
Contact us

Application Areas

  • Automation of GEZE OL 90, OL 95 N and OL 320 fanlight openers
  • Natural ventilation in the façade area
  • Inward-opening bottom-hung leaves
  • Installation on wooden, PVC or metal windows
  • Frame installation

Technical data

E 212 24 V
Dimensions 211 x 30 x 80 mm
Space needed on frame (min.) Necessary space should be determined individually
Space requirement on leaf (min.) Necessary space should be determined individually
Compressive force 1500 N
Tensile force 1500 N
Operating voltage 24 V DC
Current consumption 1.2 A
Power consumption 29 W
Duty rating 25 %
Min. core cross section 2.5 mm²
Number of cores 3 cores
Service temperature -20 - 60 °C
IP rating IP42
Type of stroke shortening Mechanical
End position cut-off extended Limit switches
End position cut-off retracted Limit switches
Overload cut-off Yes
Bottom-hung window INWARD-opening frame installation Yes