Boxer

Guide rail Boxer 20,7 mm * With an overall height of 20.7 mm and lever

Guide rail Boxer 20.7 mm overall height
  • With screwed slide block
Contact us

Application Areas

  • Single leaf doors
  • Integrated installation
  • Right and left single-action doors

Technical data

Guide rail Boxer 20,7 mm
Length 440 mm
Width 31 mm
Height 20.7 mm
opening restrictor upgradable Yes
Hold-open function Optional

Downloads

Variants & Accessories

Contact

GEZE Central +971-4-454-1434 Hotline for architects +971-4-454-1434 GEZE Service +971-4-806-3000