Perlan

Perlan 140 KS for timber leaves * Corrosion-resistant sliding fitting system for ceiling mounting of timber leaves up to 140 kg, can be extended for glass leaves

Perlan 140
  • Extremely reliable corrosion protection for leaf weights up to 140 kg
  • Precision ball bearings in the roller carriages offer very smooth sliding action
  • Tested in accordance with EN 1670 Class 4 for external use or in extreme climatic conditions, such as swimming baths
Contact us

Application Areas

  • Corrosion-resistant fitting for exterior use
  • Sliding shutters and shading systems
  • Installation of fittings possible in combination with overhanging weather hood
  • Single and multi-leaf sliding panel
  • For ceiling installation

Technical data

Perlan 140 KS for timber leaves
Leaf material Wood
Leaf weight (max.) 140 kg
Number of leaves 1-leaf, 2-leaf
Leaf width (min.) 500 mm
Leaf width (max.) 1640 mm
Track geometry straight
Corrosion protection class 4
Type of installation Ceiling
DIN direction left / right

Downloads

Contact

GEZE Central +971-4-454-1434 Hotline for architects +971-4-454-1434 GEZE Service +971-4-806-3000